国产精品综合色区在线观看_欧美2区欧美区资源_婷婷97狠狠成人网站_蜜芽MY188精品TV在线观看_TheAV视频一区二区_99re视频在线观看精选

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator nitrogen filling vehicle operation steps

未標題-1.jpg

  

Operation steps of the accumulator nitrogen filling vehicle:

The first step: first open the control box three-wire power supply (380V);

Step 2: Open the unloading valve (position reference manual) on the hydraulic module of the pump station until the system oil pressure drops to 0 MPa (ie, the pressure gauge shows 0);

Step 3: Open the top cover of the accumulator, then unscrew the black cap inside, and rotate the handle of the nitrogen-filled special tool to the maximum position (counterclockwise to the maximum), connect the accumulator, and press the special tool handle. Rotate clockwise. When you hear the sound coming out of the gas, observe the pressure gauge on the tool. The pressure display value is the pressure of the accumulator. At this time, turn it counterclockwise to the maximum and remove the special tool.

When the pressure is less than 5 MPa, it is necessary to flush the accumulator. The above is the detection process.


清远市| 长乐市| 章丘市| 新田县| 图片| 北海市| 河间市| 西乡县| 高邑县| 乳山市| 鱼台县| 阳春市| 杨浦区| 柳江县| 开江县| 平利县| 宁波市| 惠安县| 黄冈市| 河津市| 平凉市| 共和县| 民乐县| 双江| 宁安市| 东辽县| 武山县| 泗洪县| 民乐县| 缙云县| 视频| 富源县| 保定市| 加查县| 崇义县| 荆门市| 广宁县| 舟曲县| 漠河县| 卢湾区| 栾川县|