国产精品综合色区在线观看_欧美2区欧美区资源_婷婷97狠狠成人网站_蜜芽MY188精品TV在线观看_TheAV视频一区二区_99re视频在线观看精选

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator installation precautions

皮囊式蓄能器2.jpg

 

The accumulator should be installed at a convenient location for inspection and maintenance. When used to absorb shock and pulsation, the accumulator should be close to the vibration source, and should be installed in the place where the impact is easy. The installation position should be away from the heat source to prevent the system pressure from rising due to the thermal expansion of the gas.


The accumulator must be securely fastened but not allowed to be welded to the main unit and should be securely supported on the bracket or on the wall. When the diameter ratio is too large, hoop reinforcement should also be provided.


In principle, the capsule accumulator should be installed vertically downwards. When tilting or horizontally mounted, the bladder is in contact with the shell by buoyancy, which hinders normal telescopic operation, accelerates the damage of the bladder, and reduces the risk of accumulator function. . Therefore, the method of tilting or horizontal mounting is generally not used. There are no special installation requirements for diaphragm accumulators, and the oil ports can be installed vertically, tilted or horizontally downwards.


A check valve should be installed between the pump and the accumulator to prevent the oil in the accumulator from flowing back into the pump and returning to the tank when the pump stops working, causing an accident.


长宁县| 英吉沙县| 海城市| 电白县| 彰化市| 嫩江县| 慈利县| 池州市| 石阡县| 彩票| 宁城县| 枝江市| 鹰潭市| 高密市| 资中县| 石城县| 岱山县| 循化| 甘泉县| 彝良县| 象州县| 达拉特旗| 航空| 东方市| 崇礼县| 汉寿县| 大兴区| 南康市| 铜梁县| 海淀区| 石狮市| 衡山县| 金门县| 孝感市| 潮州市| 广州市| 扎囊县| 亚东县| 万源市| 措美县| 平顶山市|